The Wisconsin Department of Natural Resources requires the Neenah Water Utility to enforce cross connection backflow compliance of Commercial, Industrial and Public Authority properties every 2 years to ensure the safety of your water supply. To fulfill requirements of DNR Code 810.15 the Compliance Statement and Existing Devices Forms must be completed. Compliance is mandatory.
A cross connection survey is an inspection of the water system piping in a building or property, starting at the water meter and ending at the last free flowing tap as required by the Department of Safety and Professional Services 382.41. Backflow prevention devices will need to be installed at the owner’s expense where current or potential unprotected cross connections exist.
Submit Forms by Mail: | Submit Forms by E-mail (pdf): |
Neenah Water Utility Attn: Cross Connection Program 211 Walnut Street Neenah, WI 54956 |
water@neenahwi.gov |
Complete the Cross Connection Compliance Statement in its entirety to satisfy part 2.A. of the Compliance Statement. Properties with DSPS Registered devices must submit copies of the test results to satisfy part 2. B. Fill out the Existing Devices Form to satisfy part 2. C. Incomplete forms will not be accepted.
Fill out the Existing Devices Form to satisfy part 2. C. of the Compliance Statement. List every device that is used to control cross connections.
SITE MAP | DISCLAIMER | ACCESSIBILITY & COMPLIANCE | © City of Neenah. All Rights Reserved. Web Design & Development by Stellar Blue Technologies.
SITE MAP | DISCLAIMER
ACCESSIBILITY & COMPLIANCE | © City of Neenah. All Rights Reserved. Web Design & Development by Stellar Blue Technologies.